7-10 OLD BAILEY

BUILDING SERVICES - COMMERCIAL

Back


Project: 7-10 Old Bailey, London
Client: MWB Group Ltd
Architect/Consulting Engineer: Sidell Gibson Architects and Avery Associates Architects
Contractor: Bowen
Sub Contractor: EI.WHS Ltd
Distributor: Pipe Centre (Bermondsey) Ltd
Specification: Crane Fluid Systems - CommPac manifold systems

CommPac manifolds from Crane Fluid Systems have been installed in the heating and cooling system of London's newest office building. The construction of no. 7-10 Old Bailey has just been completed and is designed so that the 6700sqm of new office space can be easily divided into separate units.

Crane's CommPac manifold commissioning system provides one easy point for commissioning multiple terminal units. All site connections can be made without the need to access the internal components, a feature that dramatically reduces commissioning costs and time.

Please click for PDF version.

brochure link
Terms of use | Copyright 2009 Crane BSU | Site map