Large Diameter - Power Station- Susten In Switzerland - Power Stations/Coalmines

/projects/Water/Large-Diameter---Power-Station--Susten-In-Switzerland.jpg

Client: KW Dala AG Specification: Large Diameter - 100 Bar

Project: Bespoke high pressure large diameter coupling was supplied to Swiss hydroelectric power station, KW Dala AG.
The coupling (813.9mm OD) was selected due to its ability to withstand high pressure surges of up to 100 bar after severe floods
in 2011 caused older pipes to burst leaving significant damage to the power station and a 12 month outage.

< Back